Response Options:
• Close this extra window • (browser back arrow greyed out) when ready
|
Notes:
There are different end points, depending on the circumstances.
Standard Tech Int Rundowns
A Standard Tech Interiorization Rundown is preferably to be completed in one session. If that is not possible, then it is supposed to be completed as quickly as possible, so that life doesn't get in the way too much. This is because if Int needs handling, then no other auditing action is supposed to be possible.
Process End Point
As usual.
Session End Point
As usual, but with the above proviso of getting as much done in one session as possible.
Rundown End Point
The standard EP for an Int RD is something like: No more attention on Interiorization and Exteriorization and able to continue with regular auditing.
Extended Int Rundowns
See this page for details.
|